Sign In | Join Free | My gimpguru.org
China Sussman Machinery(Wuxi) Co.,Ltd logo
Sussman Machinery(Wuxi) Co.,Ltd
Sussman Machinery (Wuxi) Co., Ltd.
Verified Supplier

10 Years

Home > Cable Tray Roll Forming Machine >

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Sussman Machinery(Wuxi) Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

  • 1
  • 2
  • 3

Brand Name : Sussman

Model Number : SM-CT

Certification : CE,SGS,ISO

Place of Origin : Jiangsu,China

MOQ : 1 set

Price : negotiable

Payment Terms : L/C, T/T

Supply Ability : 5 sets per month

Delivery Time : 60 days after deposit

Packaging Details : Film and steel wire

Thickness : 1.0-2.0mm Galvanized steel

Main Power : 5.5kw

Rolling Speed : 10-15m/min

Electric Source : 380V, 50HZ,3 phase

Roller Stations : 10 stations

Cutting : Hydraulic Cutting

Hydraulic Station : 4KW

Control system : Industry computer

Contact Now

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

Technical parameter

Items Specifications Remarks
Material of coil Material Thickness 1.0-2.0mm galvanized
Un Coiler 3 tons manual
Forming system Rolling Speed 10-15 m/min
Roller Stations 10 stations
Roller Material

Gcr15 Steel with quenching 60mm shaft

Maim Motor Power 5.5 kw
Hydraulic cutting Power 4 kw

Cutting

system

Material Of Cutting CR12 with quench treatment
Hardness HRC58-62
Tolerance +-1.5mm
Electrical control system Electric Source

380V, 50HZ,3 phase

Also can satisfy Customer’s require

Control System PLC (Panasonic) as list in the note
Weight About 3 tons

Technological process


Uncoiler—Feeding—Leveling—Punching&Cutting—Roll forming—Output table

Installation of the machine

The Individual components of the machine are installed according to the layout and prepared for the commissioning.

The installation comprises of

- Installation by Sussman service technicians.

- The following services are included.

-Installation of the machine components

-Adjustment of the machine components

- Connection of all motors to the control cabinet

-Installation of the required safety devices.

Commercial Conditions

1. Port of Loading: FOB Shanghai

2. Delivery time: 60 days after technical clearance and down payment

3. Payment: 30% TT in advance, balance before delivery

4. Assembly and comissioning: Two engineers will visit buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day. The customer should ensure the pre-installation being carried out appropriately.

5. Warranty: 12 months warranty starting from the date of the successful installation and commissioning of the equipments.

Related Products

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO


Product Tags:

metal forming machine

      

plate rolling machine

      
Quality 1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO wholesale

1.0 - 2.0mm Galvanized Steel Cable Tray Roll Forming Machine CE / SGS / ISO Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Sussman Machinery(Wuxi) Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)